2024-2025 Annual Storm Drain Repair Project (Category B)
General work description: The work to be done generally consists of rehabilitating approximately 726 linear feet of storm drain pipes using trenchless rehabilitation methods, such as Cured-in-Place-Pipe (CIPP) liner, slip lining, PVC liner etc. Cleaning and grout filling voids is also required, in addition to handling stormwater bypass. Approximately 72 linear feet of storm drain pipe will be removed and replaced with open trench, including, but not limited to bedding, trench backfill and pavement restoration. Installation of new storm drain apparatus such as a drop inlet and precast manhole, one each. Approximately 600 square feet of pavement failure repair.
Plan Holders
Date | Company | Contact |
7/10/25 4:30 pm |
Bay Area Builders Exchange
3055 Alvarado Street
San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
7/10/25 4:30 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100
San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
7/10/25 4:30 pm |
Dodge Data and Analytics
3315 Central Ave.
Hot Springs, AR 71913 |
April Hamilton
Tel: 206-328-5615
|
7/10/25 4:30 pm |
Peninsula Builders Exchange
735 Industrial Road
San Carlos, CA 94070 |
000 Plan Room
Tel: (650) 591-4486
|
7/10/25 4:30 pm |
San Francisco Builder's Exchange
850 South Van Ness Ave.
San Francisco, CA 94110 |
Deanna Johnson
Tel: 415-282-8220
|
7/10/25 4:30 pm |
Valley Contractors Exchange
951 8th ST.
Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|