Camino Pablo Median Landscape Improvements Project No. CIP 5019
General work description: The contractor shall provide all labor, materials, equipment, transportation, workmanship, and services necessary to complete the Camino Pablo Medians Landscape Improvements project in accordance with the project plans, special provisions, general conditions, construction contract, and associated appendices. The scope of work includes, but is not limited to, demolishing and disposing of designated sections of existing medians, concrete curbs, trees, shrubs, landscaping materials, and irrigation components; removing pavers with the salvage and reuse of selected units; excavating and installing a new irrigation system; planting new shrubs, and groundcover; constructing median openings; paving; and furnishing and installing Qwick Kurb Delineation System. The contractor is also responsible for implementing traffic control measures to ensure public safety and minimize disruptions to traffic flow, maintaining a clean and safe worksite, managing dust, debris, and noise, and protecting Caltrans property throughout the duration of the project. All work shall be completed in compliance with the project plans, Caltrans Standard Specifications, project special provisions, and all applicable federal, state, and local regulations. The project limits is within the Caltrans right of way.
Status
Accepting Bids
Prebid Date | 10/7/25 10:00am |
Bid Date | 10/28/25 2:00pm |
Location
Orinda, CA
Engineer's cost estimate (Bid): $175,000
A pre-bid meeting will be held on Tuesday, October 7, 2025, at 10:00 a.m. at the City Offices, (Planning Conference Room) to cover project construction. Prospective bidders attendance is recommended but non mandatory.