Camino Pablo Median Landscape Improvements Project No. CIP 5019
General work description: The contractor shall provide all labor, materials, equipment, transportation, workmanship, and services necessary to complete the Camino Pablo Medians Landscape Improvements project in accordance with the project plans, special provisions, general conditions, construction contract, and associated appendices. The scope of work includes, but is not limited to, demolishing and disposing of designated sections of existing medians, concrete curbs, trees, shrubs, landscaping materials, and irrigation components; removing pavers with the salvage and reuse of selected units; excavating and installing a new irrigation system; planting new shrubs, and groundcover; constructing median openings; paving; and furnishing and installing Qwick Kurb Delineation System. The contractor is also responsible for implementing traffic control measures to ensure public safety and minimize disruptions to traffic flow, maintaining a clean and safe worksite, managing dust, debris, and noise, and protecting Caltrans property throughout the duration of the project. All work shall be completed in compliance with the project plans, Caltrans Standard Specifications, project special provisions, and all applicable federal, state, and local regulations. The project limits is within the Caltrans right of way.
Plan Holders
Date | Company | Contact |
9/25/25 4:48 pm |
Bay Area Builders Exchange
3055 Alvarado Street
San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
9/26/25 8:01 am |
Builders Exchange of Santa Clara
400 Reed Street
Santa Clara, CA 95050 |
Kanani Fonseca
Tel: 408-727-4000
|
9/26/25 8:02 am |
ConstructConnect
30 Technology Pkwy., South
#100 Norcross, GA 30092 |
CMD/iSq Ft Constructconnect
Tel: (800) 699-8640
|
9/25/25 4:48 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100
San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
9/25/25 4:48 pm |
Dodge Data and Analytics
3315 Central Ave.
Hot Springs, AR 71913 |
April Hamilton
Tel: 206-328-5615
|
9/26/25 8:01 am |
Dodge Data and Analytics
2860 S State Highway 161
Suite 501 Grand Prairie, TX 75052 |
000 Plan Room
Tel: 413-304-2008
Fax: 306-336-2767
|
9/26/25 11:40 am |
Green Valley Group
3991 First St.
Ste.B Livermore, CA 94551 |
Alanah Pena
Tel: 925-243-1420
|
9/29/25 1:28 pm |
Kerex Engineering Inc.
93 Monte Cresta Ave.
Pleasant Hill, CA 96523 |
Hector Barajas
Project Engineer
Tel: 9253878913
Fax: 9253870853
|
9/26/25 3:09 pm |
Marina Landscape, Inc.
3707 West Garden Grove Blvd
Orange, CA 92868 |
Hue Ta
Vice President of Estimating
Tel: 714 939 6600
Fax: 714 935 1199
|
9/25/25 4:48 pm |
Peninsula Builders Exchange
735 Industrial Road
San Carlos, CA 94070 |
000 Plan Room
Tel: (650) 591-4486
|
9/25/25 4:48 pm |
San Francisco Builder's Exchange
850 South Van Ness Ave.
San Francisco, CA 94110 |
Deanna Johnson
Tel: 415-282-8220
|
9/25/25 4:48 pm |
Valley Contractors Exchange
951 8th ST.
Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|