2022 Annual Paving Project and Moraga Way Pedestrian Pathway Project
The work to be performed generally consists of pavement rehabilitation and storm drain improvements of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay, Reconstruction, and Micro Surfacing with base failures. Work to be performed also includes replacing storm drain pipes using open trench or rehabilitating storm drains using trenchless technology, replacement of rolled curbs and asphalt dikes, pavement striping, pavement widening for a new ADA-compliant path, lowering and raising of utility covers, replacing detector loops, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Bidders Required Questions | 76.8 KB | |||
Memo for Addendum 1 | 52.6 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
2022-06-13 Addendum 2 Full Set | 32.1 MB | |||
2022-06-13 Addendum 2 Updated Sheets Only | 11.4 MB | |||
2022-06-13 D42 PC Booklet - 2022 Paving Project - Addendum 2 | 488.9 KB | |||
2022-06-13 D43 SP Booklet - 2022 Paving Project - Addendum 2 | 809.4 KB | |||
Memo for Addendum 2 | 95.0 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
2022-06-23 D42 PC Booklet - 2022 Paving Project - Addendum 3 | 488.9 KB | |||
2022-06-23 D43 SP Booklet - 2022 Paving Project - Addendum 3 | 812.2 KB | |||
Memo for Addendum 3 | 79.0 KB |