2022 Annual Paving Project and Moraga Way Pedestrian Pathway Project
The work to be performed generally consists of pavement rehabilitation and storm drain improvements of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay, Reconstruction, and Micro Surfacing with base failures. Work to be performed also includes replacing storm drain pipes using open trench or rehabilitating storm drains using trenchless technology, replacement of rolled curbs and asphalt dikes, pavement striping, pavement widening for a new ADA-compliant path, lowering and raising of utility covers, replacing detector loops, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.
Proposal & Sample Contract
(click to expand/collapse)

Name | Size | ||
2022-05-11 D42 PC Booklet - 2022 Paving Project | 359.6 KB |
Special Provisions
(click to expand/collapse)

Name | Size | ||
2022-05-12 D43 SP Booklet - 2022 Paving Project | 791.8 KB |
Structural Pavement Investigation Report
(click to expand/collapse)

Name | Size | ||
2021 Orinda Structural Pavement Investigation Report 4.22.21 | 8.6 MB |